Production planning: reliable delivery dates and departments working on the right things.
What it is, how it works, which tools you need, and why an SME has as much to gain as a large company by moving from the whiteboard to planning based on real capacity.
What to produce, how much, when and on which resources.
- It decides what to produce, how much, when and on which resources, to meet deliveries at the lowest possible cost and inventory.
- It works on several levels: from the sales plan months ahead to the sequence of orders on each machine for the next shift.
- The decisive difference is between planning at infinite capacity, as most ERP systems do, and at finite capacity, which accounts for the hours machines and people really have.
- SMEs often benefit the most: small batches, many different orders, constant rush jobs and planning left to one person's memory.
- Cloud tools connected to the ERP now make accessible what was once reserved for large groups.
- In large companies it coordinates several departments and plants and balances inventory, service and costs at scale.
- It only works well with real data: cycle times, resource availability, progress. That is why it is tied to the ERP and the MES.
Production planning is the process by which a company turns customer orders and sales forecasts into a workable programme, assigning orders, quantities and dates to production resources (machines, lines, people, tooling) and checking that materials and capacity are available.
Why we talk about it. Nexus develops and integrates software for production: ERP systems, schedulers and MES must talk to each other for the plan to be realistic and up to date. This guide describes how we approach planning in companies, starting with SMEs.
The questions a good plan answers
From the big picture to the detail: six levels, each with its own horizon.
In an SME they are often all handled by the same person, but they remain logically distinct. Choose a level to see its horizon, question and result.
Scheduling
In what sequence, and on which machine, should orders run?
Gantt chart with start and end dates per operation
The planning cycle
A plan that isn't updated with what happens on the shop floor becomes useless within days: that is why effective planning is a continuous cycle, not a document.
Orders
Customer orders and sales forecasts come in.
- Customer orders
- Forecasts
- Quotes to confirm
Every weak link reduces the value of the whole chain.
The Gantt chart taking shape above the shop floor: every machine has its row, every order its place.
The ERP promises theoretical dates. Finite capacity promises real ones.
Infinite capacity
- Assumption
- Every resource can do all the work required in the period
- Where you find it
- The MRP of most ERP systems
- Result
- Theoretical dates and hidden overloads
- Effect on the shop floor
- The supervisor redoes the plan by hand, every day
Finite capacity
- Assumption
- Every resource has hours limited by calendar, shifts, stops, maintenance
- Where you find it
- Advanced planning and scheduling software (APS) and some MES
- Result
- Achievable dates and concrete sequences
- Effect on the shop floor
- The shop floor receives a sequence that is already feasible
When do the orders on your bottleneck machine really finish?
The starting values are the guide's example: three 30-hour orders on the same milling machine, which works 40 hours a week. Change the numbers and switch between infinite and finite capacity to see the difference.
- The machine's hours. How many hours it works per week, Monday to Friday.
- The orders. How many orders go through it and how many hours each one needs.
- The comparison. Switch from infinite to finite capacity: load and finish dates change.
90 h ÷ 40 h a week = 2.25 weeks of work
Now you plan: three machines, ten orders, two weeks
Drag orders from one machine to another or change their order, switch machines on and off, change the hours available each day. Each item can only be made on some machines, and every change of item costs two hours of setup: the plan is recalculated at every move.
- Drag an order onto another machine or to another point in the queue
- Switch a machine off or change its capacity and see who runs late
- Press "Schedule automatically" and compare the result with yours
Click an order to see its details and move it with the buttons, or drag it directly.
Illustrative example with made-up data. An order is on time if it finishes by the end of its due day; red bars are late. The automatic scheduler uses a simple rule (nearest due date first, then the machine that finishes soonest): real software also considers operators, materials, priorities and constraints between operations.
Finite-capacity planning: the most loaded resource is planned first and the rest adapts.
Production strategies
Make to order
You produce after the customer's order.
Suited to: Subcontracting, custom products, many variants
Scheduling methods
Forward
Start from today and calculate the earliest possible finish date. Used to promise realistic dates.
Backward
Start from the delivery date and calculate the latest moment to start. Used to reduce inventory.
Priority rules
Earliest due date, least slack, shortest processing time, strategic customer.
Grouping by setup
Similar orders (same material, colour, mould) are sequenced together to reduce changeovers.
Bottleneck management
The most loaded resource is planned first and the rest adapts (theory of constraints).
Optimisation
Algorithms that look for the best sequence, balancing on-time delivery, setups, loads and costs.
From whiteboard to scheduler: what each tool can do.
Planning can be done with whiteboards, spreadsheets, the ERP's MRP module or advanced planning and scheduling software (APS), standalone or built into the MES.
Whiteboard or planning board
StrengthsVisible to everyone, immediate
LimitsDoesn't calculate, doesn't update, lives in one place
Spreadsheet
StrengthsFlexible, already available
LimitsDepends on whoever built it, errors, no link to the shop floor
ERP's MRP
StrengthsCalculates material requirements
LimitsInfinite capacity, no sequence on machines
APS / scheduler
StrengthsFinite capacity, sequences, scenarios, realistic dates
LimitsRequires reliable routing and resource data
Scheduler in the MES
StrengthsPlan and real progress in the same system
LimitsMust be integrated with the ERP for orders and materials
Features to look for
- Interactive Gantt chart by resource: with drag-and-drop orders and instant recalculation
- Real calendars: shifts, holidays, planned maintenance, absences
- Secondary resources: operators, skills, moulds, tooling that constrain the machine
- Sequence-dependent setup times: colour, material, format changes
- Material availability: an order doesn't start if a component is missing
- Outsourced operations: with subcontractor lead times
- «What if» scenarios: new order, breakdown, rush job, extra shift
- Delivery promise (capable to promise): the realistic date already at quotation stage
- Load and delay indicators: by resource and by customer
- Shop-floor work lists: on screen or tablet
Machines and people on the same calendar: shifts, absences, maintenance and tooling.
Integration: ERP, planning, MES
The link with the MES closes the loop: the plan updates with what really happens, and the cycle times used for planning become the measured ones, not those estimated years ago. Select an arrow to see what flows.
Progress, quantities, stops, real times, scrap
Material requirements, scenario simulation and reliable delivery dates.
Why it pays off for SMEs too, and above all.
«Planning is only for large companies»
In fact planning is hardest in SMEs: small batches, many different orders, priorities that change every day, shared resources and few people. The more complex and variable the problem, the more a tool that calculates instead of relying on memory makes a difference.
How a typical SME plans today
- •One person, often the owner or production manager, keeps the plan in their head or on a spreadsheet.
- •Delivery dates are given «by feel», adding safety margins or overpromising.
- •Rush jobs jump the queue and cause knock-on delays on other orders.
- •Every morning the shop floor asks «what do I do today?».
- •When that person is away, planning stops.
What changes for an SME
Switch between «before» and «with finite capacity»
- Delivery dates
- BeforeEstimated, often missed
- Rush jobs
- BeforeAdded «by eye», effects discovered later
- Bottleneck
- BeforePerceived
- Setups
- BeforeRandom sequences
- Inventory
- BeforeHigh safety stock «to be safe»
- Overtime and subcontractors
- BeforeDecided at the last minute
- Dependence on people
- BeforeThe plan lives in the production manager's head
- Customer relations
- BeforeChasers and excuses
In short for SMEs: planning is not bureaucracy, it is how you promise real dates, make the most of the machines you already have and stop chasing rush jobs. The productive hours recovered are often worth as much as a new machine.
SMEs and large companies compared
Same logic, different problems
- Main problem
- Variability, rush jobs, dependence on one person
- Typical tool
- Cloud or MES-based scheduler, connected to the ERP
- Initial scope
- The department or the bottleneck machine
- Most visible benefit
- On-time delivery and productive hours recovered
Why it is now within an SME's reach:
- Subscription cloud software, with no servers or large upfront investment.
- Connectors for the most common ERP systems: orders and routings arrive without retyping.
- Quick configuration: start from the department or bottleneck machine, not the whole factory.
- Visual interfaces: the Gantt chart moves with the mouse, no operations-research skills needed.
- Combined with the MES: with a few modules you get plan and real progress in the same tool.
From the department plan to the work list, in four screens.
Interface examples that follow the same three 30-hour orders on the FR-01 milling machine. Click the screenshot to view it full screen.
utilisation of the FR-01 milling machine: 40 h out of 40 h, it is the week's bottleneck.
of setup in the week, with lathe orders grouped by material.
of slack for OP 26-1211: it finishes Wednesday 25 at 10:00, delivery is Friday 27.
Demo interfaces in Italian with sample data: department, customers, people and values are made up.
Every kind of production has its own planning challenge.
Job shop, make to order
Main challenge: Different routings for every order, many shared resources
The constraints of your sector
What the tool needs to know to make a realistic plan.
- Shared machines
- Outsourced operations (treatments, painting)
- Customer rush orders
The indicators to track
Measure them before and after the pilot.
Seven phases, from the bottleneck machine to the whole department.
Snapshot of the current situation
How planning is done today, who sets priorities, which data exists (routings, times, calendars), where delays come from.
Starting pointCleaning up master data
Up-to-date routings and times, correct resources and calendars, reliable bills of materials. If the ERP's times are old, the MES helps measure the real ones.
DataPilot scope
The department or bottleneck machine, where every hour gained is worth most.
Where to startShared priority rules
Between sales, production and purchasing: what goes first, who can add a rush job.
PeopleIntegration
With the ERP (orders and materials) and with the shop floor (work lists, progress).
SystemsPlanning routine
When the plan is updated, who approves it, how dates are communicated to customers.
Every dayMeasure and extend
On-time delivery, utilisation, setups before and after; then the other departments.
Step by stepSoftware selection checklist
Tick the requirements the tool you are evaluating meets
Finite-capacity planning with an interactive Gantt chart
Calendars, shifts, secondary resources and sequence-dependent setups
Ready integration with the ERP in use and with the MES
Scenario simulation and delivery promise
Shop-floor work lists on screen or tablet
Gradual rollout by department, subscription proportionate to size
A supplier with experience in the company's type of production
Mistakes to avoid
Planning with old or estimated cycle times
Modelling the whole factory in minute detail
Ignoring secondary constraints
Plan not updated with progress
Rush jobs added outside the system
No one responsible for planning
Sales left out
A plan is worth as much as the data it rests on and as much as people believe in it.
That is why we work together on master data, the tool and the planning rules.
We involve whoever plans today, sales and the shop floor: priority rules must be shared, and the plan must be understandable to those who carry it out.
We connect the scheduler, ERP and MES so that orders, materials, capacity and progress are always aligned.
We start from the bottleneck resource, measure on-time delivery and utilisation, and extend planning to the whole department and beyond.
- AnalysisOf how planning is done today, of master data (routings, times, calendars) and of the causes of delays.
- Master data clean-upIncluding measuring real times with the MES.
- Selection and configurationOf the scheduling tool suited to the company's size and type of production.
- Development and integrationERP connectors, shop-floor work lists, specific scheduling rules, dashboards.
- Link with the MESTo update the plan with real progress.
- Go-live and coachingWorking alongside the planner in the first weeks.
- SMEs: a lean solution, connected to the ERP already in use, on the department or machine that limits production. Goal: reliable delivery dates and fewer rush jobs within a few weeks, without depending on one person's memory.
- Large companies: planning models across several departments and plants, integration with group S&OP and ERP, common rules and comparable indicators.
- Workable plans, based on real capacity and not on theoretical dates.
- Proportionate solutions: no oversized system for an SME.
- Data owned by the company and standards-based integrations.
- Measured results: on-time delivery, setups, overtime before and after.
Snapshot
Of current planning and its difficulties.
Master data
Checked and corrected.
Pilot
On the bottleneck, with baseline indicators.
Integration
With the ERP and the shop floor.
Extension
And continuous improvement of the rules.
Demand that shifts, district by district: that is why planning matters.
In 2024 Emilia-Romagna's districts moved in opposite directions: some grew strongly, others fell by double digits. When demand moves like this, finite-capacity planning helps you see in time what you can really deliver.
Emilia-Romagna exports in 2025, €84.3bn 1
Parma dairy and Modena-Reggio Emilia farm machinery in 2024: two extremes in the same region 2
total district exports in 2024, €21.7bn 2
Modena
Reggio Emilia
Where we work. We are based in Modena and work on site with companies in the provinces of Modena, Reggio Emilia, Parma and Bologna. We also work with companies in other provinces and regions, remotely or with agreed visits: write to us from anywhere in Italy.
Planning terms, explained in one line.
- Production planning
- The process that turns orders and forecasts into a workable programme
- Scheduling
- The sequence of orders and operations on each resource, with start and end dates
- Finite capacity
- Planning that respects the hours actually available on each resource
- Infinite capacity
- Planning that ignores resource capacity limits
- MRP
- Calculation of material and component requirements
- MPS
- Master production schedule for finished products
- S&OP
- Integrated sales and operations planning over a medium-to-long horizon
- APS
- Advanced planning and scheduling software
- Bottleneck
- The resource that limits the capacity of the whole production system
- Setup
- Time to prepare a machine for a new production run
- Lead time
- The throughput time of an order
- Dispatching
- Assigning work to machines and operators in the short term
- Capable to promise
- Calculating a realistic delivery date based on capacity and materials
The questions we hear most often.
13 questions
What is production planning?
It is the process that decides what to produce, how much, when and on which resources, turning orders and forecasts into a workable programme that meets deliveries with contained costs and inventory.
Is production planning useful for a small company too?
Yes, often more than for a large one. SMEs have small batches, many different orders, frequent rush jobs and planning left to one person. A finite-capacity tool makes delivery dates reliable and frees productive hours without new machine investments.
What's the difference between MRP and scheduling?
MRP calculates which materials and components are needed and when, but usually ignores machine limits. Scheduling decides in what order and on which machine to run operations, respecting real capacity.
What does finite-capacity planning mean?
It means accounting for the hours machines and people really have available (shifts, stops, maintenance). The result is achievable dates, not theoretical ones.
Isn't my ERP enough?
Most ERP systems calculate requirements at infinite capacity and don't build the sequence on machines. A scheduling module, standalone or in the MES, completes the ERP without replacing it.
How long does it take to start?
In an SME you can start on one department or the bottleneck machine within a few weeks, provided routings and times are reliable.
How are rush jobs handled?
They are entered into the tool, which immediately shows which other orders slip and by how much. The decision stays with people, but based on visible effects.
Do you need very precise data?
You need realistic cycle times and correct calendars. If the ERP's times are old, it is worth measuring them with the MES: the plan improves as the data becomes real.
Which benefits can be measured?
On-time delivery, fewer setup and overtime hours, less work in progress and inventory, fewer emergency replans, faster response times to customers.
How do planning and the MES relate?
Planning decides the sequence; the MES takes it to the shop floor and collects real progress, which updates the plan. Together they close the loop between plan and execution.
And in large companies?
It coordinates several departments and plants, balances service, inventory and costs at high volumes, and evaluates strategic scenarios with rules common to the whole group.
Why choose Nexus for production planning?
Because we work together on master data, the tool and integration with the ERP and MES: the plan becomes realistic and updates with what happens on the shop floor. We propose proportionate solutions, lean for SMEs and structured for groups.
Is finite-capacity planning useful for SMEs in Emilia's districts too?
Yes, especially when demand changes quickly: in 2024 some districts in the region grew by double digits, such as Parma food machinery (+14.8%), while others fell, such as Modena and Reggio Emilia farm machinery (−22.1%). With finite capacity you immediately see which orders can be delivered and where to move resources.
Are delivery dates a daily challenge?
Let's start from the department or machine that gives you the most trouble: we'll show you how planning would change with real capacity and which data you need to begin. We reply in person, usually within one working day.