Does your ERP promise dates the shop floor can't meet? Try the difference between infinite and finite capacity→
A guide for SMEs and large companies

Production planning: reliable delivery dates and departments working on the right things.

What it is, how it works, which tools you need, and why an SME has as much to gain as a large company by moving from the whiteboard to planning based on real capacity.

90 h / 40 hhours of work required of the 5-axis milling machine against the hours it has in a week
2.25 weeksthe real time to make 3 orders of 30 hours: 90 h ÷ 40 h a week
+7 daysof hidden delay, in working days: the ERP promises everything by Friday 20 November, the last order finishes on Tuesday 1 December
225%the first week's load when planning at infinite capacity, as many ERP systems do

Case 1 of 5 · Subcontract machine shop · 5-axis milling machine on one shift (40 h a week), 3 orders of 30 hours. Illustrative examples; the first is the guide's.

In short

What to produce, how much, when and on which resources.

  • It decides what to produce, how much, when and on which resources, to meet deliveries at the lowest possible cost and inventory.
  • It works on several levels: from the sales plan months ahead to the sequence of orders on each machine for the next shift.
  • The decisive difference is between planning at infinite capacity, as most ERP systems do, and at finite capacity, which accounts for the hours machines and people really have.
  • SMEs often benefit the most: small batches, many different orders, constant rush jobs and planning left to one person's memory.
  • Cloud tools connected to the ERP now make accessible what was once reserved for large groups.
  • In large companies it coordinates several departments and plants and balances inventory, service and costs at scale.
  • It only works well with real data: cycle times, resource availability, progress. That is why it is tied to the ERP and the MES.
Definition

Production planning is the process by which a company turns customer orders and sales forecasts into a workable programme, assigning orders, quantities and dates to production resources (machines, lines, people, tooling) and checking that materials and capacity are available.

Why we talk about it. Nexus develops and integrates software for production: ERP systems, schedulers and MES must talk to each other for the plan to be realistic and up to date. This guide describes how we approach planning in companies, starting with SMEs.

The questions a good plan answers

If I accept this order, when can I really deliver it?What happens to other deliveries if I add a rush job?Which machine is next month's bottleneck?Do we need overtime, an extra shift or outsourcing?Which materials should I order, and by when?
The levels of planning

From the big picture to the detail: six levels, each with its own horizon.

In an SME they are often all handled by the same person, but they remain logically distinct. Choose a level to see its horizon, question and result.

Level 5 / 6

Scheduling

Horizon: Days–weeks
shiftdaysweeksmonths18 months
Question

In what sequence, and on which machine, should orders run?

Result

Gantt chart with start and end dates per operation

The planning cycle

A plan that isn't updated with what happens on the shop floor becomes useless within days: that is why effective planning is a continuous cycle, not a document.

Step 1 / 5

Orders

Customer orders and sales forecasts come in.

  • Customer orders
  • Forecasts
  • Quotes to confirm

Every weak link reduces the value of the whole chain.

The Gantt chart taking shape above the shop floor: every machine has its row, every order its place.

The practical point. The plan is recalculated every day, or several times a day, with progress collected by the MES. The shop floor always gets an up-to-date sequence, not the one decided on Monday morning.
Infinite and finite capacity

The ERP promises theoretical dates. Finite capacity promises real ones.

Infinite capacity

Assumption
Every resource can do all the work required in the period
Where you find it
The MRP of most ERP systems
Result
Theoretical dates and hidden overloads
Effect on the shop floor
The supervisor redoes the plan by hand, every day

Finite capacity

Assumption
Every resource has hours limited by calendar, shifts, stops, maintenance
Where you find it
Advanced planning and scheduling software (APS) and some MES
Result
Achievable dates and concrete sequences
Effect on the shop floor
The shop floor receives a sequence that is already feasible
Try it yourself

When do the orders on your bottleneck machine really finish?

The starting values are the guide's example: three 30-hour orders on the same milling machine, which works 40 hours a week. Change the numbers and switch between infinite and finite capacity to see the difference.

  1. The machine's hours. How many hours it works per week, Monday to Friday.
  2. The orders. How many orders go through it and how many hours each one needs.
  3. The comparison. Switch from infinite to finite capacity: load and finish dates change.
1The machine
8 hours a day for 5 days · one shift
2The orders
Including setup hours. Work starts on Monday 16 November 2026.
Last order finishes
Tue, 1 Dec

90 h ÷ 40 h a week = 2.25 weeks of work

capacity · 40 h
40 h
40 h
10 h
Wk 4716–20 Nov
Wk 4823–27 Nov
Wk 4930–4 Dec
Order 1 · 30 hThu, 19 Nov · 12:00
Order 2 · 30 hWed, 25 Nov · 10:00
Order 3 · 30 hTue, 1 Dec · 08:00
This is the real date to give the customer (Tue, 1 Dec · 08:00), or the point from which to decide early: bring work forward, schedule overtime, outsource.
Mini scheduler

Now you plan: three machines, ten orders, two weeks

Drag orders from one machine to another or change their order, switch machines on and off, change the hours available each day. Each item can only be made on some machines, and every change of item costs two hours of setup: the plan is recalculated at every move.

  1. Drag an order onto another machine or to another point in the queue
  2. Switch a machine off or change its capacity and see who runs late
  3. Press "Schedule automatically" and compare the result with yours
On time9 / 10
Late1
Setup hours12 h
To be planned0
Last order finishesMon, 23 Nov
Mon 16
Tue 17
Wed 18
Thu 19
Fri 20
Mon 23
Tue 24
Wed 25
Thu 26
Fri 27
M15-axis machining centre
53% · 42 h of 80 h
M23-axis machining centre
36% · 58 h of 160 h
M3CNC lathe
30% · 24 h of 80 h
To be planned
No orders waiting to be planned.

Click an order to see its details and move it with the buttons, or drag it directly.

Stainless flanges M1 · M2Steel plates M1 · M2Valve bodies M1Shafts M3Brass bushings M2 · M3Setup 2 h when the item changes

Illustrative example with made-up data. An order is on time if it finishes by the end of its due day; red bars are late. The automatic scheduler uses a simple rule (nearest due date first, then the machine that finishes soonest): real software also considers operators, materials, priorities and constraints between operations.

Finite-capacity planning: the most loaded resource is planned first and the rest adapts.

Production strategies

How it works

Make to order

You produce after the customer's order.

Suited to: Subcontracting, custom products, many variants

Scheduling methods

Forward

Start from today and calculate the earliest possible finish date. Used to promise realistic dates.

Backward

Start from the delivery date and calculate the latest moment to start. Used to reduce inventory.

Priority rules

Earliest due date, least slack, shortest processing time, strategic customer.

Grouping by setup

Similar orders (same material, colour, mould) are sequenced together to reduce changeovers.

Bottleneck management

The most loaded resource is planned first and the rest adapts (theory of constraints).

Optimisation

Algorithms that look for the best sequence, balancing on-time delivery, setups, loads and costs.

Planning software

From whiteboard to scheduler: what each tool can do.

Planning can be done with whiteboards, spreadsheets, the ERP's MRP module or advanced planning and scheduling software (APS), standalone or built into the MES.

Whiteboard or planning board

StrengthsVisible to everyone, immediate

LimitsDoesn't calculate, doesn't update, lives in one place

Spreadsheet

StrengthsFlexible, already available

LimitsDepends on whoever built it, errors, no link to the shop floor

ERP's MRP

StrengthsCalculates material requirements

LimitsInfinite capacity, no sequence on machines

APS / scheduler

StrengthsFinite capacity, sequences, scenarios, realistic dates

LimitsRequires reliable routing and resource data

Scheduler in the MES

StrengthsPlan and real progress in the same system

LimitsMust be integrated with the ERP for orders and materials

Features to look for

  • Interactive Gantt chart by resource: with drag-and-drop orders and instant recalculation
  • Real calendars: shifts, holidays, planned maintenance, absences
  • Secondary resources: operators, skills, moulds, tooling that constrain the machine
  • Sequence-dependent setup times: colour, material, format changes
  • Material availability: an order doesn't start if a component is missing
  • Outsourced operations: with subcontractor lead times
  • «What if» scenarios: new order, breakdown, rush job, extra shift
  • Delivery promise (capable to promise): the realistic date already at quotation stage
  • Load and delay indicators: by resource and by customer
  • Shop-floor work lists: on screen or tablet

Machines and people on the same calendar: shifts, absences, maintenance and tooling.

Integration: ERP, planning, MES

The link with the MES closes the loop: the plan updates with what really happens, and the cycle times used for planning become the measured ones, not those estimated years ago. Select an arrow to see what flows.

ERPorders, BOMs, stock
Planningfinite-capacity scheduler
MESshop floor, progress
MES → Planning

Progress, quantities, stops, real times, scrap

Materials and capacity, together. An order doesn't start if a component is missing: the scheduler reads stock and purchase orders from the ERP, and the date promised to the customer accounts for both (capable to promise).

Material requirements, scenario simulation and reliable delivery dates.

Benefits

Why it pays off for SMEs too, and above all.

The myth to debunk

«Planning is only for large companies»

In fact planning is hardest in SMEs: small batches, many different orders, priorities that change every day, shared resources and few people. The more complex and variable the problem, the more a tool that calculates instead of relying on memory makes a difference.

How a typical SME plans today

  • •One person, often the owner or production manager, keeps the plan in their head or on a spreadsheet.
  • •Delivery dates are given «by feel», adding safety margins or overpromising.
  • •Rush jobs jump the queue and cause knock-on delays on other orders.
  • •Every morning the shop floor asks «what do I do today?».
  • •When that person is away, planning stops.

What changes for an SME

Switch between «before» and «with finite capacity»

Delivery dates
BeforeEstimated, often missed
Rush jobs
BeforeAdded «by eye», effects discovered later
Bottleneck
BeforePerceived
Setups
BeforeRandom sequences
Inventory
BeforeHigh safety stock «to be safe»
Overtime and subcontractors
BeforeDecided at the last minute
Dependence on people
BeforeThe plan lives in the production manager's head
Customer relations
BeforeChasers and excuses

In short for SMEs: planning is not bureaucracy, it is how you promise real dates, make the most of the machines you already have and stop chasing rush jobs. The productive hours recovered are often worth as much as a new machine.

SMEs and large companies compared

Same logic, different problems

Main problem
Variability, rush jobs, dependence on one person
Typical tool
Cloud or MES-based scheduler, connected to the ERP
Initial scope
The department or the bottleneck machine
Most visible benefit
On-time delivery and productive hours recovered

Why it is now within an SME's reach:

  • Subscription cloud software, with no servers or large upfront investment.
  • Connectors for the most common ERP systems: orders and routings arrive without retyping.
  • Quick configuration: start from the department or bottleneck machine, not the whole factory.
  • Visual interfaces: the Gantt chart moves with the mouse, no operations-research skills needed.
  • Combined with the MES: with a few modules you get plan and real progress in the same tool.
What it looks like day to day

From the department plan to the work list, in four screens.

Interface examples that follow the same three 30-hour orders on the FR-01 milling machine. Click the screenshot to view it full screen.

Nexus Plan · department plan
100%

utilisation of the FR-01 milling machine: 40 h out of 40 h, it is the week's bottleneck.

8 h

of setup in the week, with lathe orders grouped by material.

2 days

of slack for OP 26-1211: it finishes Wednesday 25 at 10:00, delivery is Friday 27.

Demo interfaces in Italian with sample data: department, customers, people and values are made up.

Production types, sectors and indicators

Every kind of production has its own planning challenge.

Workshops, subcontractors

Job shop, make to order

Main challenge: Different routings for every order, many shared resources

What to focus onFinite capacity on critical machines, realistic dates at quotation

The constraints of your sector

What the tool needs to know to make a realistic plan.

  • Shared machines
  • Outsourced operations (treatments, painting)
  • Customer rush orders

The indicators to track

Measure them before and after the pilot.

On-time delivery (OTD)Orders delivered by the promised date
Production lead timeTime from order release to end of production
Resource utilisationPlanned hours over available hours, by machine and department
Schedule adherenceHow much of what was planned the shop floor carried out
Setup hoursTime lost on changeovers
Work in progress (WIP)Material waiting between operations
Inventory turnoverHow fast stock is renewed
ReplanningNumber of plan changes for rush jobs or disruptions
Overtime and outsourcingCost of additional capacity
How to introduce it

Seven phases, from the bottleneck machine to the whole department.

Snapshot of the current situation

How planning is done today, who sets priorities, which data exists (routings, times, calendars), where delays come from.

Starting point

Cleaning up master data

Up-to-date routings and times, correct resources and calendars, reliable bills of materials. If the ERP's times are old, the MES helps measure the real ones.

Data

Pilot scope

The department or bottleneck machine, where every hour gained is worth most.

Where to start

Shared priority rules

Between sales, production and purchasing: what goes first, who can add a rush job.

People

Integration

With the ERP (orders and materials) and with the shop floor (work lists, progress).

Systems

Planning routine

When the plan is updated, who approves it, how dates are communicated to customers.

Every day

Measure and extend

On-time delivery, utilisation, setups before and after; then the other departments.

Step by step

Software selection checklist

Tick the requirements the tool you are evaluating meets

0 / 7
  • Finite-capacity planning with an interactive Gantt chart

  • Calendars, shifts, secondary resources and sequence-dependent setups

  • Ready integration with the ERP in use and with the MES

  • Scenario simulation and delivery promise

  • Shop-floor work lists on screen or tablet

  • Gradual rollout by department, subscription proportionate to size

  • A supplier with experience in the company's type of production

Mistakes to avoid

Planning with old or estimated cycle times
Consequence: Plans the shop floor can't meetHow to avoid it: Measure real times with the MES and update them
Modelling the whole factory in minute detail
Consequence: A long project and an unmanageable planHow to avoid it: Start from critical resources, the rest at aggregate capacity
Ignoring secondary constraints
Consequence: Impossible sequences (mould in use, operator absent)How to avoid it: Add the secondary resources that really constrain
Plan not updated with progress
Consequence: The shop floor goes back to the whiteboardHow to avoid it: Link to the MES or end-of-operation declarations
Rush jobs added outside the system
Consequence: The plan loses credibilityHow to avoid it: Every rush job goes through the tool, with visible impact
No one responsible for planning
Consequence: The tool is abandonedHow to avoid it: A named planner, even part time in SMEs
Sales left out
Consequence: Dates promised without looking at the planHow to avoid it: Delivery dates confirmed by the tool at quotation stage
How we work

A plan is worth as much as the data it rests on and as much as people believe in it.

That is why we work together on master data, the tool and the planning rules.

People

We involve whoever plans today, sales and the shop floor: priority rules must be shared, and the plan must be understandable to those who carry it out.

Systems

We connect the scheduler, ERP and MES so that orders, materials, capacity and progress are always aligned.

Progress

We start from the bottleneck resource, measure on-time delivery and utilisation, and extend planning to the whole department and beyond.

  • AnalysisOf how planning is done today, of master data (routings, times, calendars) and of the causes of delays.
  • Master data clean-upIncluding measuring real times with the MES.
  • Selection and configurationOf the scheduling tool suited to the company's size and type of production.
  • Development and integrationERP connectors, shop-floor work lists, specific scheduling rules, dashboards.
  • Link with the MESTo update the plan with real progress.
  • Go-live and coachingWorking alongside the planner in the first weeks.
For SMEs and large companies
  • SMEs: a lean solution, connected to the ERP already in use, on the department or machine that limits production. Goal: reliable delivery dates and fewer rush jobs within a few weeks, without depending on one person's memory.
  • Large companies: planning models across several departments and plants, integration with group S&OP and ERP, common rules and comparable indicators.
Our commitments
  • Workable plans, based on real capacity and not on theoretical dates.
  • Proportionate solutions: no oversized system for an SME.
  • Data owned by the company and standards-based integrations.
  • Measured results: on-time delivery, setups, overtime before and after.

Snapshot

Of current planning and its difficulties.

Master data

Checked and corrected.

Pilot

On the bottleneck, with baseline indicators.

Integration

With the ERP and the shop floor.

Extension

And continuous improvement of the rules.

The Emilia-Romagna context

Demand that shifts, district by district: that is why planning matters.

In 2024 Emilia-Romagna's districts moved in opposite directions: some grew strongly, others fell by double digits. When demand moves like this, finite-capacity planning helps you see in time what you can really deliver.

+1.3%

Emilia-Romagna exports in 2025, €84.3bn 1

+31% / −22.1%

Parma dairy and Modena-Reggio Emilia farm machinery in 2024: two extremes in the same region 2

−2%

total district exports in 2024, €21.7bn 2

Province of

Modena

  • 2025 exports: €18.3bn (+0.3%); transport equipment +5.1%, machinery −4.9%, food +9.8%. 3
  • Sassuolo tile, cured meats and Carpi knitwear districts. 2
Province of

Reggio Emilia

  • Mechatronics −9.8% and dairy +18.9% in 2024. 2
  • Farm machinery −22.1%, a district shared with Modena. 2
Province of

Parma

  • Food machinery +14.8%, food +2.7%, dairy +31% in 2024. 2
Province of

Bologna

  • Packaging machinery −2.7%, mopeds −4.8%, biomedical +0.6% in 2024. 2

Where we work. We are based in Modena and work on site with companies in the provinces of Modena, Reggio Emilia, Parma and Bologna. We also work with companies in other provinces and regions, remotely or with agreed visits: write to us from anywhere in Italy.

Glossary

Planning terms, explained in one line.

Production planning
The process that turns orders and forecasts into a workable programme
Scheduling
The sequence of orders and operations on each resource, with start and end dates
Finite capacity
Planning that respects the hours actually available on each resource
Infinite capacity
Planning that ignores resource capacity limits
MRP
Calculation of material and component requirements
MPS
Master production schedule for finished products
S&OP
Integrated sales and operations planning over a medium-to-long horizon
APS
Advanced planning and scheduling software
Bottleneck
The resource that limits the capacity of the whole production system
Setup
Time to prepare a machine for a new production run
Lead time
The throughput time of an order
Dispatching
Assigning work to machines and operators in the short term
Capable to promise
Calculating a realistic delivery date based on capacity and materials
Frequently asked questions

The questions we hear most often.

13 questions

What is production planning?

It is the process that decides what to produce, how much, when and on which resources, turning orders and forecasts into a workable programme that meets deliveries with contained costs and inventory.

Is production planning useful for a small company too?

Yes, often more than for a large one. SMEs have small batches, many different orders, frequent rush jobs and planning left to one person. A finite-capacity tool makes delivery dates reliable and frees productive hours without new machine investments.

What's the difference between MRP and scheduling?

MRP calculates which materials and components are needed and when, but usually ignores machine limits. Scheduling decides in what order and on which machine to run operations, respecting real capacity.

What does finite-capacity planning mean?

It means accounting for the hours machines and people really have available (shifts, stops, maintenance). The result is achievable dates, not theoretical ones.

Isn't my ERP enough?

Most ERP systems calculate requirements at infinite capacity and don't build the sequence on machines. A scheduling module, standalone or in the MES, completes the ERP without replacing it.

How long does it take to start?

In an SME you can start on one department or the bottleneck machine within a few weeks, provided routings and times are reliable.

How are rush jobs handled?

They are entered into the tool, which immediately shows which other orders slip and by how much. The decision stays with people, but based on visible effects.

Do you need very precise data?

You need realistic cycle times and correct calendars. If the ERP's times are old, it is worth measuring them with the MES: the plan improves as the data becomes real.

Which benefits can be measured?

On-time delivery, fewer setup and overtime hours, less work in progress and inventory, fewer emergency replans, faster response times to customers.

How do planning and the MES relate?

Planning decides the sequence; the MES takes it to the shop floor and collects real progress, which updates the plan. Together they close the loop between plan and execution.

And in large companies?

It coordinates several departments and plants, balances service, inventory and costs at high volumes, and evaluates strategic scenarios with rules common to the whole group.

Why choose Nexus for production planning?

Because we work together on master data, the tool and integration with the ERP and MES: the plan becomes realistic and updates with what happens on the shop floor. We propose proportionate solutions, lean for SMEs and structured for groups.

Is finite-capacity planning useful for SMEs in Emilia's districts too?

Yes, especially when demand changes quickly: in 2024 some districts in the region grew by double digits, such as Parma food machinery (+14.8%), while others fell, such as Modena and Reggio Emilia farm machinery (−22.1%). With finite capacity you immediately see which orders can be delivered and where to move resources.

Let's talk

Are delivery dates a daily challenge?

Let's start from the department or machine that gives you the most trouble: we'll show you how planning would change with real capacity and which data you need to begin. We reply in person, usually within one working day.

info@nexus-software.it